Part H of the Building Regulations is the official set of requirements, in England, for drainage and waste disposal in building work: foul water, wastewater treatment, rainwater, building over sewers, separate systems of drainage, and solid waste storage. The practical document most people mean when they say “Part H” is Approved Document H (2015 edition), which gives guidance on ways of meeting those requirements. It is guidance, not the only possible way to comply, and it is not a retrospective rulebook for every existing drain that has not been altered. This page is a plain-language introduction for homeowners and their designers, not a substitute for the official text, not legal advice, and not a compliance certificate.
Blockage Busters inspects accessible existing drainage with the latest drain cameras. We can tell you what the pipe shows, and we can quote a repair if a defect should be dealt with. We do not certify that new work meets the Building Regulations, and we are not a building-control body. Call 07379 424891 with your postcode and what you are planning or what you have found, or use the contact form. A survey is not a repair, so the no-fix, no-fee promise does not apply to the inspection itself. If a clearance is needed so the camera can pass, that work is quoted separately. That clearance is backed by the company’s no-fix, no-fee promise. We send survey results over within 2–3 days. If wastewater is overflowing, treat it as urgent. Blockage Busters offers 24/7 call-outs.
We offer 24/7 call-outs. No fix, no fee applies to agreed drain unblocking only: if we cannot complete that unblocking, you will not be charged for that work. CCTV surveys, mapping, repairs, lining, planned jetting and grease-trap work are quoted separately.
Blockage Busters is based in Enfield, North London. We cover London, Hertfordshire, Essex, Bedfordshire, Buckinghamshire and Cambridgeshire, and the towns in those counties, and Peterborough and its surrounding towns. Give your postcode when you enquire so we can confirm we can attend the property.
What the six requirements are, in everyday terms
Approved Document H is organised around six requirements. H1 is foul water drainage: wastewater from WCs, baths, sinks and similar fittings should be carried away without risk to health, and the guidance covers pipe sizes, access, traps and ventilation. H2 is about wastewater treatment systems and cesspools, which is relevant only where a property is not connected to a public sewer — a separate specialist question, and not a service we claim to design or to empty. H3 is rainwater drainage: roofs and paved areas should be drained so that water does not damage the building. H4 is building over sewers, which we cover in our dedicated guide to building over a sewer; the undertaker’s agreement process sits alongside, and is not the same thing as Building Regulations approval. H5 is separate systems of drainage: where a sewerage undertaker has provided separate foul and surface-water public sewers, new drainage should keep those flows apart. H6 is solid waste storage, which is about refuse, not about drains.
You do not need to memorise the numbers. The useful idea is that Part H applies when you are carrying out building work in England — a new house, an extension, a new bathroom, a new drain — and that your designer and a building-control body are responsible for showing how the work complies. An unaltered drain in an older house is not automatically “tested” against the current Approved Document. If that drain is failing, the question is what the pipe shows and what repair, relining or excavation would be honest, not whether a 1930s clay run matches a 2015 table.
What a drainage contractor can usefully do, and what we will not sign off
A CCTV survey of the accessible existing run, with the latest drain cameras, is often what a designer, a building-control officer or a solicitor actually wants to see before drawings go too far. We describe condition, apparent connections, access, and limits. We send survey results over within 2–3 days. If you also need the line located on the ground, we offer drain mapping; we send your completed drain map over within 2–3 days. We will not rubber-stamp another contractor’s findings without looking, and we will not issue a “Part H certificate” we are not authorised to issue.
Access, gradients, chambers and the separation of foul and rainwater are all matters the Approved Document discusses in detail. We will describe what we find on the existing pipe — standing water, a missing opening, a rainwater connection that appears to enter a foul drain — in plain language. We will not turn that description into a legal determination, and we will not tell you that a layout “passes” or “fails” Part H as a substitute for building control. For ownership of the existing run, see who is responsible for your drain.
If a collapse or a serious defect sits under a proposed extension, that is a poor thing to build over, agreement or not. Deal with it as a quoted drainage repair before the slab goes down. If excavation is agreed, Blockage Busters carries out full reinstatement — we put everything back afterwards.
Planning, building control and the undertaker are three different things
Planning permission, Building Regulations approval and a sewerage undertaker’s build-over or connection agreement are often all in play on the same project, and none of them is a substitute for the others. A conservatory or a driveway that did not need planning can still raise drainage questions under Part H, and can still sit over a public sewer. We will not tell you that you are “fine” on all three. We inspect drains.
Give us the postcode, a sketch if you have one, and the reason for the enquiry — a proposed extension, a new bathroom, a defect already found, a homebuyer survey. If sewage is escaping, that is an immediate drainage problem, not a regulations seminar. Keep people and pets away and call.
The official text is on GOV.UK, free to read, and it should be the document your designer uses. This page is only a map of what it covers.
Frequently asked questions
Is Approved Document H a law I have to follow on my existing drains?
Part H of the Building Regulations applies to building work in England. Approved Document H is guidance on ways of meeting those requirements. It is not a retrospective test of every unaltered older drain. If you are altering or adding drainage, your designer and building-control body should apply it to that work.
Will you certify that my extension meets Part H?
No. We inspect accessible existing drainage and describe what we find. We are not a building-control body and we do not issue a compliance certificate. Design and approval of new work sit with your designer and building control.
Is a build-over agreement the same as Part H?
No. A build-over or diversion agreement is the sewerage undertaker’s process for work over or near a public sewer. Building Regulations approval is separate. Our building-over guide covers the undertaker’s process. You may need both.
Do you deal with septic tanks under H2?
H2 is the requirement for wastewater treatment systems and cesspools where a property is not on a public sewer. We inspect accessible drainage. We do not design, empty or certify a treatment plant or a cesspool.
Do you cover my area?
Blockage Busters is based in Enfield, North London. We cover London, Hertfordshire, Essex, Bedfordshire, Buckinghamshire and Cambridgeshire, and the towns in those counties, and Peterborough and its surrounding towns. Give your postcode when you enquire so we can confirm we can attend the property.
Related pages
- Drain fall and gradients
- Benching and channels
- Rodding eyes
- Building over a sewer
- Drains and extensions
- Who is responsible for my drain?